Show simple item record

contributor authorJohn H. Sargent
date accessioned2017-05-08T21:19:08Z
date available2017-05-08T21:19:08Z
date copyrightOctober 1988
date issued1988
identifier other%28asce%291052-3928%281988%29114%3A4%28376%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/46858
description abstractThe Channel Tunnel project to link Great Britain and France has been under consideration since the 19th century. Several attempts have been made, but until recently no project had been supported sufficiently to ensure success. In 1986, in response to British and French government invitation, a twin bored rail‐tunnel scheme submitted by the Anglo‐French promoter Channel Tunne Group‐France Manche was accepted. The scheme is privately financed and will be owned by Eurotunnel—a private sector Anglo‐French group—which is required to build and operate the fixed link under a 55‐year concession. The scheme is called “Eurotunnel” and incorporates two rail tunnels and an interlinked service tunnel and terminals near Folkstone in England and Coquelles in France. The system is based on rail transportation but permits private and commercial road vehicles to be carried on a shuttle system in addition to transporting rail passengers and rail freight by conventional means. The capital cost is just under £2.8 billion and a mix of equity and loan finance has been raised of just over £6 billion.
publisherAmerican Society of Civil Engineers
titleChannel Tunnel Project
typeJournal Paper
journal volume114
journal issue4
journal titleJournal of Professional Issues in Engineering
identifier doi10.1061/(ASCE)1052-3928(1988)114:4(376)
treeJournal of Professional Issues in Engineering:;1988:;Volume ( 114 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record