description abstractVarious factors in the fabrication and erection of the prefabricated parallel wire strand (PWS) used for most of the Honshu‐Shikoku Bridges in Japan affect the quality and construction period. Several developments in these factors are presented and discussed. In addition, the advanced air spinning (AS) techniques used for the Shimotsui Seto Bridge in this project are also presented.
publisherAmerican Society of Civil Engineers
titleAdvanced Fabrication and Erection Techniques for Long Suspension Bridge Cables
typeJournal Paper
journal volume116
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1990)116:1(112)
treeJournal of Construction Engineering and Management:;1990:;Volume ( 116 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record