contributor authorMohamed-Asem U. Abdul-Malak
contributor authorZeina Hassanein
date accessioned2017-05-08T21:14:57Z
date available2017-05-08T21:14:57Z
date copyrightMay 2001
date issued2001
identifier other%28asce%290887-3828%282001%2915%3A2%2862%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44247
description abstractSubcontracting is a common, and sometimes warranted, practice on large construction projects. However, it is also well recognized that disputes are likely to develop between subcontractors and general contractors in trying to achieve target objectives of cost, quality, and time. This paper tackles quality- and time-related disputes that are peculiar to the case of subcontracting asphalt works under a large construction program, such as that of a new airport construction. In particular, it reports on disagreements regarding the achieved thickness and surface smoothness of the constructed asphalt concrete layer, and on activity-interfacing and delay-attribution issues resulting from improper contractual and scheduling practices. Factors believed to be relevant to both classes of disputes are identified, and analyses are offered to pinpoint significant anomalies. Finally, arguments are developed and recommendations given, that reflect best industry practices whose application could help minimize the likelihood of facing such disputes in the future.
publisherAmerican Society of Civil Engineers
titleAsphalt Works Subcontracting Disputes in Large Construction Programs
typeJournal Paper
journal volume15
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(2001)15:2(62)
treeJournal of Performance of Constructed Facilities:;2001:;Volume ( 015 ):;issue: 002
contenttypeFulltext