Show simple item record

contributor authorGregory P. Luth
date accessioned2017-05-08T21:14:54Z
date available2017-05-08T21:14:54Z
date copyrightMay 2000
date issued2000
identifier other%28asce%290887-3828%282000%2914%3A2%2851%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/44210
description abstractThis paper presents a brief chronology of the events that preceded the collapse of the walkways at the Kansas City Hyatt Regency Hotel, including the prior failure that occurred during construction and the evolution of the detail that caused the catastrophe. Many of the facts surrounding the case were not publicized, due to the litigation. Some were not brought out during the litigation. No attempt will be made to affix responsibility, as these issues were resolved years ago. The chronology is followed by a discussion of the events that contributed to the collapse and of the changes that have been made in the industry toward preventing a similar occurrence.
publisherAmerican Society of Civil Engineers
titleChronology and Context of the Hyatt Regency Collapse
typeJournal Paper
journal volume14
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)0887-3828(2000)14:2(51)
treeJournal of Performance of Constructed Facilities:;2000:;Volume ( 014 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record