Show simple item record

contributor authorShamsi, Syed Safeer Mehdi
contributor authorBarberis, Stefano
contributor authorKamali, Kiavash
contributor authorRomei, Alessandro
contributor authorPersico, Giacomo
contributor authorTraverso, Alberto
date accessioned2026-08-23T08:42:11Z
date available2026-08-23T08:42:11Z
date copyright2026/06/01
date issued2026
identifier issn0742-4795
identifier othergtp-25-1501.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4316918
description abstractAbstract. Pumped thermal energy storage (PTES), a subcategory of Carnot battery technologies has attracted attention in recent years, mainly because of its ability to use grid arbitrage to convert electricity to be stored as heat (charging), which can be again converted to electric power (discharging). The benefit offered by the heat as the storage medium is the direct supply of heat for industrial or district heating purposes (heat as output) as well as the integration of heat sources to support the cycle performance (heat as input) usually in the charging cycle. The latter configuration is referred to as thermally integrated PTES (TI-PTES). A key advantage of TI-PTES is that it allows the integrated heat to be stored together with electricity during charging and used at a latter time of high demand while removing the constraint of cold storage especially for Brayton cycle-based TI-PTES plants as well. Leveraging on such a concept, the EU SCO2OP-TES project aims at demonstrating a sCO2-based TI-PTES up to TRL 5 through a lab-scale demonstration plant using industrial waste heat (WH) as integrated heat source; the charging and discharging cycles are sCO2-based Brayton heat pump and power cycles, respectively, adopting radial turbomachinery for both the hot compressor (charging) and the hot turbine(discharging). Along with the mean line design and computational fluid dynamics (CFD) analysis of the sCO2 turbomachines, this study explores the influence of their part load operation on the SCO2OPTES TI-PTES demonstration plant. The study elaborates on the effect of partial electric loads considered for hot compressor (high-temperature turbomachine for the charging) and for hot turbine (high-temperature turbomachine for discharging) on the waste heat recovery unit in the charging cycle, thermal energy storage heat exchanger, recuperator, and cooler in the discharging cycle. Separate and combined performance of the charging and the discharging cycles because of variations in thermodynamics and mass flows is evaluated. The part load scenario shows an exceedingly small off design envelop for the charging cycle (mostly limited by the hot compressor operating envelope), while for the discharging cycle, the part load operation benefits from a broader operational range as well as allowable mitigation space. Based on such results, preliminary operational constraints for the proper controllability of the cycles are suggested.
publisherThe American Society of Mechanical Engineers (ASME)
titleTurbomachinery Design and Part-Load Operation Analysis of a Supercritical CO2 Cycle-Based Thermally Integrated Pumped Thermal Energy Storage Experimental Test Rig
typeJournal Paper
journal volume148
journal issue6
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.4070111
treeJournal of Engineering for Gas Turbines and Power:;2026:;volume( 148 ):;issue:006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record