Users of this system, can login to view this document.
Login
Enter the following information to request a copy of the document from the responsible person.
Optimization of Tubing and Pump Installation Parameters of Fractured Horizontal Wells in Shale Gas Reservoirs: Method and Case Study
This email address is used for sending the document.