description abstractAbstractTransmission line (TL) towers may fail prematurely during mandatory testing for many reasons, even though they were designed based on the provisions of different standards. Five premature failures observed during full-scale testing at the Tower ...Practical ApplicationsThe reasons for the premature failure of transmission line towers during prototype testing are discussed. The reasons for failure are categorized as failure due to inadequate redundant patterns in design and failure due to improper ...
publisherAmerican Society of Civil Engineers
titleDetailing Redundant Pattern–Induced Failures in Transmission Line Towers
typeJournal Article
journal volume30
journal issue3
journal titleJournal of Structural Design and Construction Practice
identifier doi10.1061/JSDCCC.SCENG-1721
journal fristpage04025035-1
journal lastpage04025035-12
page12
treeJournal of Structural Design and Construction Practice:;2025:;Volume ( 030 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record