Show simple item record

contributor authorMcConnell, William
contributor authorClevenger, Caroline
date accessioned2026-08-20T11:15:17Z
date available2026-08-20T11:15:17Z
date copyright2026/01/22
date issued2026
identifier otherJLADAH.LADR-1439.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311920
description abstractAbstractA contract termination for default (T-for-D) is a drastic remedy that an owner maintains against a contractor under standard construction contract forms. An owner can default-terminate a contractor based on significant breaches of contractual ...
publisherAmerican Society of Civil Engineers
titleReview of Termination for Default Provisions in Standard Contract Forms and Drafting, Administrative, and Operational Considerations for Contractors and Owners
typeJournal Article
journal volume18
journal issue2
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/JLADAH.LADR-1439
journal fristpage04526009-1
journal lastpage04526009-10
page10
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2026:;Volume ( 018 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record