Show simple item record

contributor authorZhao, Tong
date accessioned2026-08-20T11:13:05Z
date available2026-08-20T11:13:05Z
date copyright2025/03/24
date issued2025
identifier otherJLADAH.LADR-1260.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311861
description abstractAbstractLost productivity is a common cause of cost overrun on construction projects and often results in construction claims. There are several different loss of productivity quantification methods and variants of those methods. Due to lack of adequate ...
publisherAmerican Society of Civil Engineers
titleToward a Rigorous Classification of Loss of Productivity Quantification Methods
typeJournal Article
journal volume17
journal issue3
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/JLADAH.LADR-1260
journal fristpage04525010-1
journal lastpage04525010-12
page12
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2025:;Volume ( 017 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record