| contributor author | Gan, Quan | |
| contributor author | Chen, Qingfa | |
| contributor author | Guo, Xiangyong | |
| contributor author | Xiao, Fan | |
| contributor author | Duan, Zhiwei | |
| contributor author | Xiao, Tiqun | |
| date accessioned | 2026-08-20T10:51:00Z | |
| date available | 2026-08-20T10:51:00Z | |
| date copyright | 2025/07/11 | |
| date issued | 2025 | |
| identifier other | IJGNAI.GMENG-10555.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4311348 | |
| description abstract | Abstract To tackle the technical challenges posed by mining steeply inclined thick ore bodies
in deep mines, a combined mining method of roof pillar–induced caving and nonpillar
sublevel caving was devised. One of the critical steps to ensure the ... | |
| publisher | American Society of Civil Engineers | |
| title | Calculation of Temporary Roof Pillar Structure Parameters for a Novel Combined Mining Method | |
| type | Journal Article | |
| journal volume | 25 | |
| journal issue | 9 | |
| journal title | International Journal of Geomechanics | |
| identifier doi | 10.1061/IJGNAI.GMENG-10555 | |
| journal fristpage | 04025201-1 | |
| journal lastpage | 04025201-15 | |
| page | 15 | |
| tree | International Journal of Geomechanics:;2025:;Volume ( 025 ):;issue: 009 | |
| contenttype | Fulltext | |