Show simple item record

contributor authorTao, Sha
contributor authorYu, Junying
contributor authorZhu, Jianbo
contributor authorChen, Shiwei
contributor authorLi, Xiao
date accessioned2026-08-20T10:42:42Z
date available2026-08-20T10:42:42Z
date copyright2026/03/11
date issued2026
identifier otherJCEMD4.COENG-17505.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311156
description abstractAbstractPrecast component (PC) production is a critical stage within the prefabricated construction supply chain. Motivated by a practical challenge observed in PC manufacturing, this study investigates an integrated PC production scheduling problem that ...
publisherAmerican Society of Civil Engineers
titlePrecast Component Production Scheduling Considering Outsourcing and Multiskilled Resources
typeJournal Article
journal volume152
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17505
journal fristpage04026040-1
journal lastpage04026040-18
page18
treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record