Show simple item record

contributor authorYang, Zhongze
contributor authorLu, Weisheng
contributor authorWu, Liupengfei
contributor authorXu, Jinying
date accessioned2026-08-20T10:41:25Z
date available2026-08-20T10:41:25Z
date copyright2026/05/27
date issued2026
identifier otherJCEMD4.COENG-17200.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4311127
description abstractAbstractWorkflow variability is a classic management challenge that could seriously impede production or project performance. However, there are sporadic efforts to analyze it in modular integrated construction (MiC), particularly its off-site ...
publisherAmerican Society of Civil Engineers
titleAnalysis of Workflow Variability in Modular Integrated Construction Manufacturing Using Cooperative Game Theory
typeJournal Article
journal volume152
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/JCEMD4.COENG-17200
journal fristpage04026115-1
journal lastpage04026115-12
page12
treeJournal of Construction Engineering and Management:;2026:;Volume ( 152 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record