Show simple item record

contributor authorHai, Tao
contributor authorZhou, Jincheng
contributor authorZain, Jasni Mohamad
contributor authorVafa, Saeid
date accessioned2023-08-16T18:33:15Z
date available2023-08-16T18:33:15Z
date copyright10/19/2022 12:00:00 AM
date issued2022
identifier issn0195-0738
identifier otherjert_145_4_042101.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4292124
description abstractPenetration of plug-in hybrid electric vehicles (PHEVs) is capable of alleviating numerous global environmental and energy challenges. Utilization of a significant number of PHEVs with significant capacity and control capabilities can increase electrical grid flexibility. However, optimum management of such vehicles with renewable energy sources (RESs) would be one of the primary difficulties needing to be investigated. In the form of a microgrid, the operation of substantial RESs’ and PHEVs’ penetration would be achieved when operating within a microgrid. The problem has been formulated and approached as a single-objective optimization model aiming to minimize the total cost of the grid-tied MG. The converged barnacles mating optimizer (CBMO) algorithm is deployed to tackle the problem. The derived results verify the desired performance of the method compared to well-established ones. In scenario 1, the CBMO method determines the MG operating costs that are lower than those given by some well-established methods including the genetic algorithm (GA), imperialist competitive algorithm (ICA), and particle swarm optimization (PSO). The cost computed by the CBMO is 263.632 €ct/day. Likewise, the values of cost for scenarios 2 and 3 utilizing the hybrid CBMO method are 300.1364 €ct/day and 336.2154 €ct/day, respectively. The findings confirm the usefulness of the proposed CBMO algorithm with an excellent convergence rate. Comparing the average solution time of the CBMO algorithm with those provided by other algorithms reveals the excellent performance of the CBMO method. The obtained results indicate that the mean simulation time of the suggested CBMO approach in the first case is 5.19 s, whereas the time required by the GA, PSO, and ICA is 12.92 s, 10.73 s, and 7.27 s, respectively.
publisherThe American Society of Mechanical Engineers (ASME)
titleCost Optimization and Energy Management of a Microgrid Including Renewable Energy Resources and Electric Vehicles
typeJournal Paper
journal volume145
journal issue4
journal titleJournal of Energy Resources Technology
identifier doi10.1115/1.4055696
journal fristpage42101-1
journal lastpage42101-12
page12
treeJournal of Energy Resources Technology:;2022:;volume( 145 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record