Show simple item record

contributor authorDe Paepe
contributor authorWard;Pappa
contributor authorAlessio;Coppitters
contributor authorDiederik;Montero Carrero
contributor authorMarina;Tsirikoglou
contributor authorPanagiotis;Contino
contributor authorFrancesco
date accessioned2022-08-18T12:56:38Z
date available2022-08-18T12:56:38Z
date copyright5/20/2022 12:00:00 AM
date issued2022
identifier issn0742-4795
identifier othergtp_144_06_061012.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4287143
description abstractWaste heat recovery through cycle humidification is considered as an effective tool to increase the operational flexibility of micro gas turbines (mGTs) in cogeneration in a decentralized energy system (DES) context. Indeed, during periods with low heat demand, the excess thermal power can be reintroduced in the cycle under the form of heated water/steam, leading to improved electrical performance. The micro humid air turbine (mHAT) has been proven to be the most effective route for cycle humidification; however, so far, all research efforts focused on optimizing the mHAT performance at nominal electrical load, in the absence of any thermal load. Nevertheless, in a DES context, the thermal and electrical load of the mGT need to be changed depending on the demand, requiring both optimal nominal and part load performances. To address this need, in this paper, we present the first step toward the development of a control strategy for a Turbec T100 mGT-mHAT test rig. First, using experimental data, the global performance, depending on the operating point as well as the humidity level, has been assessed. Second, the performance of the saturation tower, i.e., the degree of saturation (relative humidity) of the working fluid leaving this saturator, is analyzed to assess the optimal water injection system control parameter settings. Results show that optimal mHAT performance can only be obtained when the working fluid leaving the saturation tower is fully saturated, but does not contain a remaining liquid fraction. Under these conditions, a maximal amount of waste heat is transferred from the water to the mGT working fluid in the saturation tower. From these data, some general observations can be made to optimize the performance, being maximizing injection pressure and aiming for a water flow rate of ≈5m3/h. Besides these general recommendations, having a specific control matrix, that allows setting the saturation tower control parameters for any set of operational setpoint and the inlet conditions would lead to optimized performance. Therefore, future work involves the development of a control matrix, using advanced data postprocessing for noise reduction and accuracy improvement, as well as an experimental validation of this methodology on the actual test rig.
publisherThe American Society of Mechanical Engineers (ASME)
titleControl Strategy Development for Optimized Operational Flexibility From Humidified Microgas Turbine: Saturation Tower Performance Assessment
typeJournal Paper
journal volume144
journal issue6
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.4053704
journal fristpage61012-1
journal lastpage61012-9
page9
treeJournal of Engineering for Gas Turbines and Power:;2022:;volume( 144 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record