| contributor author | Alan de Oliveira Lopes | |
| contributor author | Michelle Andrade | |
| date accessioned | 2022-08-18T12:19:57Z | |
| date available | 2022-08-18T12:19:57Z | |
| date issued | 2022/05/10 | |
| identifier other | %28ASCE%29LA.1943-4170.0000548.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4286442 | |
| description abstract | Cost engineering aims to obtain reliable cost and schedule estimates. However, many public works demand additional costs that are considerably higher than the initial cost estimates. In Brazil, this can be partially explained by how the government hires public works services. Because of the high frequency of this problem and the associated damage, the aspects that impact overpricing should be better understood, including fraudulent acts. This paper presents a case study to demonstrate how cost engineering can be used to identify frauds in Brazilian public works. The research method was based on a quantitative approach to describe the estimated overbilling through bibliographic and documentary analysis of forensics engineering expert reports. Data from public works contracts were obtained for a 4-year period, which resulted in an average percentage of overbilling. This index enabled identifying fraudulent evidence in Brazilian public works that match a period of highly corrupt practices in the country. | |
| publisher | ASCE | |
| title | Fighting Corruption in Public Works: The Use of Cost Engineering in Criminal Investigation | |
| type | Journal Article | |
| journal volume | 14 | |
| journal issue | 3 | |
| journal title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| identifier doi | 10.1061/(ASCE)LA.1943-4170.0000548 | |
| journal fristpage | 04522014 | |
| journal lastpage | 04522014-7 | |
| page | 7 | |
| tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2022:;Volume ( 014 ):;issue: 003 | |
| contenttype | Fulltext | |