Show simple item record

contributor authorRujia Li
contributor authorHuayang Lei
contributor authorYingnan Liu
contributor authorYajie Zhang
contributor authorYao Hu
date accessioned2022-08-18T12:15:26Z
date available2022-08-18T12:15:26Z
date issued2022/05/06
identifier other%28ASCE%29GM.1943-5622.0002431.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4286294
description abstractTunneling inevitably induces changes in soil stress and, hence, may adversely affect the surrounding ground and nearby existing tunnels. A model test and a series of numerical analyses were carried out to investigate the response of the ground and existing tunnels in sandy soil to nearby tunneling according to the relative spacing. The test results showed that increasing the distance-to-diameter ratio (d/D) changed the settlement trough from W-shaped to U-shaped along the transverse section. In addition, the major settlement area induced by each advancing step along the longitudinal section was within 0.75D in front of the tunnel face. The numerical results showed that the overall downward movement of the existing tunnel was due to the combined action of soil pressure and excavation unloading. In this article, the mechanism of the W-shaped surface settlement is discussed; a modified Peck formula is used to describe the W-shaped settlement trough, and the relation of typical parameters to d/D is analyzed.
publisherASCE
titleGround Movement and Existing Tunnel Deformation Induced by Overlapped Tunneling
typeJournal Article
journal volume22
journal issue7
journal titleInternational Journal of Geomechanics
identifier doi10.1061/(ASCE)GM.1943-5622.0002431
journal fristpage04022098
journal lastpage04022098-12
page12
treeInternational Journal of Geomechanics:;2022:;Volume ( 022 ):;issue: 007
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record