Show simple item record

contributor authorYugal Kishor Patanwar
contributor authorDebasis Deb
date accessioned2022-05-07T21:09:03Z
date available2022-05-07T21:09:03Z
date issued2022-2-1
identifier other(ASCE)GM.1943-5622.0002254.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283381
description abstractStability of underground working depends on geomechanical properties of rocks as well as geometrical and operational parameters of excavation. In this study, a fuzzy rule-based method, minimizing the subjectivity in rock engineering system (RES) is proposed to address the uncertainty in determining stability of underground pillars. A total of 243 elastoplastic 3D numerical models are analyzed by varying attributes of five input (leading) variables: (1) rock mass strength, (2) depth (in situ stress), (3) height of excavation (stope), (4) sequence of excavation with or without filling, and (5) crown pillar thickness. Interaction matrix between the leading input variables are evaluated using fuzzy “IF–THEN” rules considering the results of finite-element models (FEMs) and the “cause–effect” plot of the variables are also determined. Average equivalent plastic strain (EPS) over two consecutive pillars is the target output variable indicating the stability of the excavated zone (stope)–pillar system. Results of FEMs are plotted in the existing stope stability number graph and show that ESP¯≈0.06−0.07 denotes the boundary between “stable” and “transition” zone and ESP¯≈0.09−0.1 represents the boundary between “transition” and “caved” zone. A rib pillar stability index (RPSI) is formulated based on the vulnerability of a pillar for the evaluation of EPS¯ indicating the “stable” or “unstable” condition. Results show that plastic strain decreases exponentially with increasing RPSI having R2 of 0.824. The proposed concept is applied to determine the stability of stopes of a hard rock mine by estimating RPSI and EPS¯ and finds that they are placed in “stable” zone for the given geomining conditions.
publisherASCE
titleDevelopment of Coupled FEM and Fuzzy Rules–Based Procedures for Mitigation of Uncertainty in Forecasting Stability of Underground Pillars
typeJournal Paper
journal volume22
journal issue2
journal titleInternational Journal of Geomechanics
identifier doi10.1061/(ASCE)GM.1943-5622.0002254
journal fristpage04021276
journal lastpage04021276-18
page18
treeInternational Journal of Geomechanics:;2022:;Volume ( 022 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record