Show simple item record

contributor authorAhmed S. Swelam
contributor authorAdel I. Eldosouky
contributor authorTamer M. El Korany
date accessioned2022-05-07T19:52:38Z
date available2022-05-07T19:52:38Z
date issued2021-11-30
identifier other(ASCE)LA.1943-4170.0000522.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281766
description abstractThere is a growing demand for arbitration as a method of settling disputes in engineering cases. This study’s primary advantage is to contrast British and Egyptian arbitration proceedings in construction and to recommend some amendments to the Egyptian arbitration procedures, especially the Egyptian Arbitration Law (EAL). For example, according to the EAL, in order for the arbitral award to be enforced, first it must be deposited in a court that has jurisdiction over its execution. Second, in order for it to be deposited, 90 days must have passed since its issuance. This research finds that the reduction of this duration will achieve more prompt justice. The study consists of three steps: (1) comprehending the Arbitration Act 1996 and Institution of Civil Engineers (ICE) proceedings; (2) giving insight into the attributes, challenges, and problems of the Egyptian arbitration procedures to improve the current ones by understanding the British arbitration mechanism; and (3) holding face-to-face and/or online interviews with some Egyptian arbitration experts to develop Egyptian arbitration procedures.
publisherASCE
titleProposed Amendments to EAL Procedures in Construction
typeJournal Paper
journal volume14
journal issue1
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/(ASCE)LA.1943-4170.0000522
journal fristpage04521047
journal lastpage04521047-9
page9
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2021:;Volume ( 014 ):;issue: 001
contenttypeFulltext