description abstractFor underground structures at coastal areas, inflow/infiltration (I/I) control is a critical procedure to guarantee their quality, especially for manholes, which are more likely to have structural problems and I/I problems. There are several methods that could address these problems, including spraying, grouting, and in situ lining. In this case study, a combined grouting method is proposed for a deep-buried double-walled manhole rehabilitation project, the Diyar Al Muharraq (DAM) project in Bahrain. This case study involves I/I investigation, rehabilitation design, construction management, and evaluation of rehabilitation according to the monitoring data. The 4-step grouting method shows an excellent rehabilitation performance, the monitoring data show that the water level in manholes lowered by 21.35%, and the brine pressure at the bottom of manholes decreased by 78.26%, which means the combined grouting method is effective for manhole rehabilitation at coastal areas.
publisherASCE
titleGrouting Methods in Manhole Rehabilitations at Coastal Areas: Case Study
typeJournal Paper
journal volume12
journal issue3
journal titleJournal of Pipeline Systems Engineering and Practice
identifier doi10.1061/(ASCE)PS.1949-1204.0000542
journal fristpage05021003-1
journal lastpage05021003-12
page12
treeJournal of Pipeline Systems Engineering and Practice:;2021:;Volume ( 012 ):;issue: 003