Show simple item record

contributor authorAbigail R. Clarke-Sather
contributor authorJennifer R. McConnell
contributor authorEmal Masoud
date accessioned2022-01-31T23:29:47Z
date available2022-01-31T23:29:47Z
date issued2/1/2021
identifier other%28ASCE%29BE.1943-5592.0001657.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269824
description abstractBiannual bridge inspections are federally mandated for hundreds of thousands of bridges in the United States. This represents a significant expenditure of labor and equipment resources. Lean engineering is a framework to improve the efficiency of processes, which was applied to the bridge inspection process in this work. Thirty-two routine bridge inspections were shadowed and analyzed as a four-stage process (consisting of document review, mobilization and demobilization, onsite inspection, and report writing) that included 52 distinct activities. Each activity that occurred during a shadowed bridge inspection was categorized as value added or by type of waste. Most of the time was considered value added, but several types of waste were identified for possible reduction. Statistical analysis showed significant differences in the duration of bridge inspection for certain bridge types and inspection equipment utilized. With the many aging bridges in the United States, utilizing lean engineering to identify areas for further improvement has the potential for reducing the effort of routine bridge inspection.
publisherASCE
titleApplication of Lean Engineering to Bridge Inspection
typeJournal Paper
journal volume26
journal issue2
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0001657
journal fristpage04020120-1
journal lastpage04020120-13
page13
treeJournal of Bridge Engineering:;2021:;Volume ( 026 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record