Show simple item record

contributor authorYeneneh Tamirat Negash
contributor authorAbdiqani Muse Hassan
date accessioned2022-01-30T21:30:27Z
date available2022-01-30T21:30:27Z
date issued10/1/2020 12:00:00 AM
identifier other%28ASCE%29CO.1943-7862.0001912.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268326
description abstractPrior studies have focused on identifying and ranking critical success factors (CSFs), but both their interdependence and the vagueness resulting from human judgment have been neglected. Furthermore, there is a need to explain CSFs from the short- and long-term planning horizons. This study aims to identify, rank, and examine the interdependence of the critical factors affecting construction projects in low-income economies. The study applied the fuzzy Delphi method (FDM) to validate subfactors identified from the literature. The hierarchical relationship between success factors and linguistic preferences is considered by using a fuzzy analytical hierarchical process (FAHP) and a fuzzy decision-making trial and evaluation laboratory (FDEMATEL) methodology. The former is applied to rank the relative weights of the factors and subfactors, and the latter is used to discover the nature of their interrelationship. The results indicate that over the short term, the relationships with the clients, consultants, designers, top management, and the financial situation of the contractor are essential. However, for strategic management and long-term success, the most influential factors are the external environment and the types of projects undertaken. Therefore, the economic climate, technical and professional capabilities, and costs, funds, and resources should be the primary concerns when establishing the project goals. Furthermore, this study provides managerial and theoretical implications to guide construction projects from both short- and long-term perspectives.
publisherASCE
titleConstruction Project Success under Uncertainty: Interrelations among the External Environment, Intellectual Capital, and Project Attributes
typeJournal Paper
journal volume146
journal issue10
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001912
page13
treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 010
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record