Show simple item record

contributor authorScheyla Maria Cardinal
contributor authorCarlos Eduardo Tosin
contributor authorSilvio Edmundo Pilz
contributor authorMarcelo Fabiano Costella
date accessioned2022-01-30T21:28:02Z
date available2022-01-30T21:28:02Z
date issued12/1/2020 12:00:00 AM
identifier other%28ASCE%29CF.1943-5509.0001521.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268251
description abstractIn Brazil’s public university sector, there is a lack of information regarding the building inspection activity; besides, there is a normative gap in this area. This paper’s objective was to develop and validate an inspection management method focused on the management of building maintenance in universities. Design science research was adopted to develop the artifact called the inspection method for maintenance management, which was evaluated in a university in Brazil. This method consists of scope, planning, inspection, verification, prioritization, and recommendation steps. It was found that the application of the inspection method in the case study provided a maintenance inspection guided by scope and prioritization. However, it is necessary to align design information, especially for new buildings, with the maintenance strategies to meet the required performance criteria. The inspection method for maintenance management could be experimented in other commercial buildings, as long as the design needs were adjusted.
publisherASCE
titleInspection Method for Building Maintenance Management in Higher Education Institutions
typeJournal Paper
journal volume34
journal issue6
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0001521
page9
treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record