Show simple item record

contributor authorC. O. Benjamin
contributor authorD. L. Babcock
contributor authorN. B. Yunus
contributor authorJ. Kincaid
date accessioned2017-05-08T21:12:17Z
date available2017-05-08T21:12:17Z
date copyrightApril 1990
date issued1990
identifier other%28asce%290887-3801%281990%294%3A2%28124%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42657
description abstractThe development of efficient construction plans and schedules presents continuing challenges to construction schedulers. Knowledge‐based systems offer considerable potential as computer‐based planning tools to aid the development of realistic project plans and schedules. This paper outlines the development of a knowledge‐based prototype system for construction planning and scheduling and evaluates its effectiveness as a tool for improving the productivity of inexperienced construction project schedulers. The prototype, developed using the M.1 knowledge engineering shell, incorporates data bases, algorithm, and heuristics that mimic the decision process of expert construction project schedulers and identifies a work breakdown structure and precedence relationships. Inexperienced schedulers using the prototype system to plan and schedule the construction of a particular type of reinforced concrete building recorded significant improvements in scheduling performance. These results confirm the system's effectiveness and support the further development of knowledge‐based systems as tools for improving the productivity of the construction industry.
publisherAmerican Society of Civil Engineers
titleKnowledge‐Based Prototype for Improving Scheduling Productivity
typeJournal Paper
journal volume4
journal issue2
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)0887-3801(1990)4:2(124)
treeJournal of Computing in Civil Engineering:;1990:;Volume ( 004 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record