description abstractConstruction delays are a common problem in all developing and developed countries, costing the industry billions of dollars every year. Understanding the major delay factors for construction projects is the first step in reducing this unnecessary loss. There are 6, 15, 3, and 5 studies identifying the respective top delay factors of Indonesia, Malaysia, Vietnam, and Thailand reported in the literature. Thirty-five of 42 possible delay factors were identified as top delay factors for these countries, which means that some factors may not be appropriate. An examination of these 29 studies is required to establish the respective top delay factors of Indonesia, Malaysia, Thailand, and Vietnam. Preventive/mitigating measures for each top delay factor identified to minimize construction delays in Indonesia, Malaysia, Thailand, and Vietnam are presented.
publisherAmerican Society of Civil Engineers
titleConstruction Delays in Indonesia, Malaysia, Thailand, and Vietnam
typeJournal Paper
journal volume24
journal issue3
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)SC.1943-5576.0000434
page04019013
treePractice Periodical on Structural Design and Construction:;2019:;Volume ( 024 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record