Show simple item record

contributor authorMcElhaney, Kevin S.
contributor authorMischler, Robert
date accessioned2019-03-17T11:02:54Z
date available2019-03-17T11:02:54Z
date copyright12/10/2018 12:00:00 AM
date issued2019
identifier issn0742-4795
identifier othergtp_141_05_052801.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4256579
description abstractTunnels represent one of the most severe operating conditions for diesel engines in diesel-electric locomotive applications, specifically for nonventilated tunnels located at high elevation. High ambient air temperatures are observed in these tunnels due to heat rejected from the locomotive engines through the exhaust and engine cooling and lubrication systems. Engine protection algorithms cause the maximum allowable engine horsepower to be reduced due to these conditions leading to a reduction in train speed and occasionally train stall. A first law based model was developed to simulate the performance of a train pulled by GE diesel-electric locomotives equipped with medium speed diesel engines in a high altitude and nonventilated tunnel. The model was compared against and calibrated to actual tunnel operation data of EPA Tier 2 compliant locomotives. The model was then used to study the impact of engine design changes required for EPA Tier 4 compliant locomotives, specifically the introduction of exhaust gas recirculation (EGR), on engine, locomotive, and train performance in the tunnel. Simulations were completed to evaluate engine control strategies targeting same or better train performance than the EPA Tier 2 compliant locomotive baseline case. Simulation results show that the introduction of EGR reduces train performance in the tunnel by increasing the required reduction in engine horsepower, but is slightly offset by improved performance from other engine design changes. The targeted engine and train performance could be obtained by disabling EGR during tunnel operation.
publisherThe American Society of Mechanical Engineers (ASME)
titleModeling and Analysis of Tier 4 Locomotives Operating in a High-Altitude Tunnel
typeJournal Paper
journal volume141
journal issue5
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.4041037
journal fristpage52801
journal lastpage052801-10
treeJournal of Engineering for Gas Turbines and Power:;2019:;volume( 141 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record