Show simple item record

contributor authorLeandro M. P. Beltrão; Michele T. M. Carvalho
date accessioned2019-03-10T12:01:26Z
date available2019-03-10T12:01:26Z
date issued2019
identifier other%28ASCE%29CO.1943-7862.0001606.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4254669
description abstractRisks capable of impacting project objectives are intrinsic to the construction industry. Effective risk analysis has key importance to professionals concerned with construction goals, especially in public enterprises, given the amount of money invested and the demand for modern infrastructure. Therefore, this study aims to identify the main public construction risks and present a practical fuzzy analytic hierarchy process (AHP) model to prioritize these risks in Brazilian public enterprises. The model is divided into three steps: (1) risk identification and development of the risk breakdown structure, (2) pairwise comparisons, and (3) risk prioritization. Throughout the case study, 54 risks were identified, which were organized into eight categories. The major risk in the Brazilian scenario was “difficulty in environmental licensing.” Although this study focused on a specific context, its methodology provides a reliable and practical framework that can be adjusted to various construction projects worldwide to assess risks. Additionally, the identified risks can provide sound guidance to practitioners globally, because their elicitation was based on studies concerning different countries.
publisherAmerican Society of Civil Engineers
titlePrioritizing Construction Risks Using Fuzzy AHP in Brazilian Public Enterprises
typeJournal Paper
journal volume145
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001606
page05018018
treeJournal of Construction Engineering and Management:;2019:;Volume ( 145 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record