Show simple item record

contributor authorWang Jinwen;Hu Wenbin;Liu Shuangquan
date accessioned2019-02-26T07:53:05Z
date available2019-02-26T07:53:05Z
date issued2018
identifier other%28ASCE%29WR.1943-5452.0000889.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250053
description abstractThis paper presents a short-term hydropower scheduling model to determine the number of operating units and the power in each quarter hour and for each hydroplant. A reservoir operation and hydropower unit commitment problem are formulated and solved using linear programming (LP) and dynamic programming (DP), respectively. Two temporal scales are coupled with each other in formulating the reservoir operation problem, with the quarter-hourly and hourly scales used for power and water balances, respectively. The model has its advantages in adapting to preferences of shift engineers by prioritizing the objective and constraints, as well as in taking into account the roles of reservoirs in balancing power demands. The model and procedure are applied to deal with the Yunnan provincial hydropower system that consists of 37 reservoirs, believed to be one of the largest-scale problems ever reported. The experience from this work suggests that the gap between academy and industry is mainly attributable to modeling, not the methods or algorithms used to solve the models.
publisherAmerican Society of Civil Engineers
titleShort-Term Hydropower Scheduling Model with Two Coupled Temporal Scales
typeJournal Paper
journal volume144
journal issue2
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)WR.1943-5452.0000889
page4017095
treeJournal of Water Resources Planning and Management:;2018:;Volume ( 144 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record