Show simple item record

contributor authorHam Namhyuk;Moon Sungkon;Kim Ju-Hyung;Kim Jae-Jun
date accessioned2019-02-26T07:52:57Z
date available2019-02-26T07:52:57Z
date issued2018
identifier other%28ASCE%29CO.1943-7862.0001498.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250038
description abstractDesign errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework.
publisherAmerican Society of Civil Engineers
titleEconomic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project
typeJournal Paper
journal volume144
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001498
page5018006
treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record