| contributor author | Kim Hwa Young;Julien Pierre Y. | |
| date accessioned | 2019-02-26T07:49:57Z | |
| date available | 2019-02-26T07:49:57Z | |
| date issued | 2018 | |
| identifier other | %28ASCE%29HY.1943-7900.0001467.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4249702 | |
| description abstract | The construction of eight consecutive weirs along the Nakdong River changed the erosion and sedimentation patterns after the Four Major River Restoration Project. This study examines the sedimentation problems upstream of Sangju Weir with a new procedure combining: (1) the flow-duration; (2) the sediment rating curve; (3) the series expansion of the modified Einstein point procedure; and (4) the trap efficiency. For weirs or low-head dams, trap efficiency is not only a function of sediment size ds, but also varies with discharge Q and water stage of the reservoir H. At Sangju Weir, trap efficiency varies from 24 to 99%, the incoming sediment load is about 425, t/year and the annual reservoir sedimentation rate is estimated at 332, t/year, which corresponds to a .76% annual reduction in reservoir storage capacity. Two hydraulic threshold values for discharge and weir operation stage are obtained from a 2-year daily sediment transport simulation. The two threshold values balancing the hydropower production revenue and the sediment excavation cost are (1) a flow discharge threshold of 6 m3/s and (2) a stage threshold of EL 43.6 m. The stage should be kept low during floods to minimize sedimentation. | |
| publisher | American Society of Civil Engineers | |
| title | Hydraulic Thresholds to Mitigate Sedimentation Problems at Sangju Weir, South Korea | |
| type | Journal Paper | |
| journal volume | 144 | |
| journal issue | 6 | |
| journal title | Journal of Hydraulic Engineering | |
| identifier doi | 10.1061/(ASCE)HY.1943-7900.0001467 | |
| page | 5018005 | |
| tree | Journal of Hydraulic Engineering:;2018:;Volume ( 144 ):;issue: 006 | |
| contenttype | Fulltext | |