| contributor author | Marzouk Mohamed;Othman Ahmed;Enaba Mohamed;Zaher Mohamed | |
| date accessioned | 2019-02-26T07:49:13Z | |
| date available | 2019-02-26T07:49:13Z | |
| date issued | 2018 | |
| identifier other | %28ASCE%29LA.1943-4170.0000254.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4249618 | |
| description abstract | The construction industry is permeated with claims that result from changes in quantities, quality, specifications, and many other issues. One way to minimize the effect of these claims is handling them in a proactive manner; this allows the project parties to foresee the potential claims and take necessary measures to avoid them. Thus, project parties will share common goals and achieve project success. This research introduces a building information modeling (BIM)-based claims analysis and evaluation model. Firstly, different claim causes are represented from previous research efforts. Secondly, claim automation and delay analysis methods are introduced. Thirdly, the research methodology is displayed to show how to forecast potential claims and quantify them using the proposed framework. Afterwards, a case study is presented to demonstrate how the proposed framework can be applied on and produce the required result. Finally, a claim report is generated showing actual and potential claims, their causes, evaluation, and recommendations to derogate their consequences. | |
| publisher | American Society of Civil Engineers | |
| title | Using BIM to Identify Claims Early in the Construction Industry: Case Study | |
| type | Journal Paper | |
| journal volume | 10 | |
| journal issue | 3 | |
| journal title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| identifier doi | 10.1061/(ASCE)LA.1943-4170.0000254 | |
| page | 5018001 | |
| tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2018:;Volume ( 010 ):;issue: 003 | |
| contenttype | Fulltext | |