Show simple item record

contributor authorZhang Guang-chao;Tan Yun-liang;Liang Sai-jiang;Jia Hong-guo
date accessioned2019-02-26T07:43:04Z
date available2019-02-26T07:43:04Z
date issued2018
identifier other%28ASCE%29GM.1943-5622.0001217.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4248900
description abstractDetermining a suitable width of gob-side filling wall (GFW) is a major concern in the application of gob-side entry retaining (GER) technology in highly gassy coal mines. This paper presents a workflow for GFW width design based on a rigorous numerical modeling analysis. A meticulously validated numerical model was built to analyze the vertical stress, entry convergence, and plastic zone distribution across the GFW with various sizes. In order to ensure the reliability of the numerical model, a strain-softening model for GFW modeling and a double-yield model for gob modeling were implemented, and the relevant input parameters’ calibration was clearly illustrated. The results demonstrated that when the GFW’s width is 2.5 m, it possesses sufficient load-bearing capacity, and the entry convergence variation tends to stabilize. Consequently, the rational GFW width was estimated as 2.5 m. The field monitoring results demonstrate that a gob-side entry, with a 2.5-m-wide GFW, meets the cross section requirement for gas drainage. The proposed design workflow and modeling procedure can potentially be applied to other GER design under similar geological conditions.
publisherAmerican Society of Civil Engineers
titleNumerical Estimation of Suitable Gob-Side Filling Wall Width in a Highly Gassy Longwall Mining Panel
typeJournal Paper
journal volume18
journal issue8
journal titleInternational Journal of Geomechanics
identifier doi10.1061/(ASCE)GM.1943-5622.0001217
page4018091
treeInternational Journal of Geomechanics:;2018:;Volume ( 018 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record