Show simple item record

contributor authorRathnayaka Suranji;Shannon Benjamin;Jiang Rui;Kodikara Jayantha
date accessioned2019-02-26T07:33:36Z
date available2019-02-26T07:33:36Z
date issued2018
identifier other%28ASCE%29PS.1949-1204.0000329.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4247888
description abstractIt was reported that the leak-before-break (LBB) concept has potential merit for use as a tool for large-diameter pipe failure prevention in the water industry. For this purpose, a detailed understanding of pipe failure mechanisms and the LBB time window between leak initiation and failure is essential. Controlled laboratory experiments can provide valuable information to address this research question. Therefore, this paper presents a new fully automated laboratory test facility that was developed to investigate the time window between leak initiation and final burst (during fatigue crack growth with variable internal loading including pressure transients) in large-diameter cast iron water pipe. The new setup will be used to validate the application of LBB and to quantify the LBB time window for proactive pipe monitoring for failure prevention. A full-scale pipe test conducted using the new test facility is presented to demonstrate the capability of the new test facility.
publisherAmerican Society of Civil Engineers
titleNew Laboratory Test Facility Developed to Investigate the Leak-Before-Break Window of Large-Diameter Cast Iron Water Pipes
typeJournal Paper
journal volume9
journal issue3
journal titleJournal of Pipeline Systems Engineering and Practice
identifier doi10.1061/(ASCE)PS.1949-1204.0000329
page4018010
treeJournal of Pipeline Systems Engineering and Practice:;2018:;Volume ( 009 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record