Show simple item record

contributor authorHector Martin
contributor authorTimothy M. Lewis
contributor authorAndrew Petersen
contributor authorEverson Peters
date accessioned2017-12-30T13:05:45Z
date available2017-12-30T13:05:45Z
date issued2017
identifier other%28ASCE%29CP.1943-5487.0000614.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245526
description abstractThe process of choosing a project delivery method is infused with cognitive uncertainties associated with the decision maker. Fuzzy uncertainties arise because of imprecise understanding and subsequent representation of these uncertainties by the decision maker, whereas random uncertainties arise from variance of these imprecisions. Since there are no well-defined rules for spontaneous decisions, in order to be consistently confident in the appropriateness of the chosen delivery method, a structured approach incorporating uncertainty is required. Previously unanswered questions such as (1) what are the sources of uncertainty in project delivery decisions, (2) how do decision makers conceptualize uncertainties, and (3) how the use of existing models increase or decrease uncertainty, were investigated. The answer to these questions revealed that while fuzziness has been accounted for in present procurement theory, the modeling of randomness has been neglected. Therefore, a forward normal cloud model that uses a normal distribution membership function was built to rank decision makers’ preferences. This proposed approach provides a better conceptualization of project delivery decision making, and is shown to be more sensitive in distinguishing alternatives compared on factors, than the interval analytical hierarchy process (AHP) rough-set approach. Survey results showed statistical significance (p<0.05) for the model’s reliability in choosing the preferred delivery method. Overall, construction decision makers can be confident that conflicting project outcomes will less likely result from their recommendations as the proposed cloud model enables clients to perform quantitative calculations incorporating a wider spectrum of uncertainties in their decision.
publisherAmerican Society of Civil Engineers
titleCloudy with a Chance of Fuzzy: Building a Multicriteria Uncertainty Model for Construction Project Delivery Selection
typeJournal Paper
journal volume31
journal issue1
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)CP.1943-5487.0000614
page04016046
treeJournal of Computing in Civil Engineering:;2017:;Volume ( 031 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record