| contributor author | David Kelly | |
| date accessioned | 2017-12-30T12:56:46Z | |
| date available | 2017-12-30T12:56:46Z | |
| date issued | 2016 | |
| identifier other | %28ASCE%29LA.1943-4170.0000163.pdf | |
| identifier uri | http://138.201.223.254:8080/yetl1/handle/yetl/4243741 | |
| description abstract | The literature is lacking an operational framework for understanding the relationship between postbid negotiation and resulting project performance measures (e.g., cost, schedule, quality, safety, and relationships). Similarly, no attempt has been made to propose a model for the buyout process that respects the full spectrum of variables constraining general contractor (GC) purchasing decisions. Postbid negotiations, including the practices of bid shopping and bid peddling, are reviewed in the context of both legal and ethical limitations. Through synthesis of the applicable case law, legislative statues, and scholarly research on the topic, several thought-provoking problem statements are put forth along with an operational framework for their resolution. Previous work on the distinction between project buyout and bid shopping is extended. A model buyout approach is proposed that respects the various contingent parameters at work. Academicians can benefit through thoughtful consideration of the conceptual framework and the suggested research agenda. Likewise, industry participants can benefit by gaining a broader understanding of the legal, ethical, and practical aspects of postbid negotiation. | |
| publisher | American Society of Civil Engineers | |
| title | Legal, Ethical, and Practical Considerations of Postbid Negotiations in the Award of Building Construction Subcontracts | |
| type | Journal Paper | |
| journal volume | 8 | |
| journal issue | 4 | |
| journal title | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction | |
| identifier doi | 10.1061/(ASCE)LA.1943-4170.0000163 | |
| page | B6514001 | |
| tree | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2016:;Volume ( 008 ):;issue: 004 | |
| contenttype | Fulltext | |