Show simple item record

contributor authorPeixin Shi
contributor authorWei Liu
contributor authorJianli Pan
contributor authorCaicheng Yu
date accessioned2017-12-30T12:55:02Z
date available2017-12-30T12:55:02Z
date issued2018
identifier other%28ASCE%29GT.1943-5606.0001801.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243374
description abstractThis paper presents a case study on the jacking load during the installation of Gongbei tunnel pipe roof using microtunneling. The pipe roof, consisting of 36 pieces of 1,620-mm-diameter steel pipes along a curved alignment, provides the preexcavation support for the Gongbei tunnel, which has a cross-sectional area of 338  m2 and a length of 255 m. The design jacking load was compared with the field measurement, and the difference was investigated. The equation for estimating the face penetration thrust during the slurry type microtunneling was recommended, and a formulation for predicting the total jacking load of the segmented steel pipe along the curved alignment was developed on the basis of the force equilibrium analysis. The unit side frictional resistance and the frictional coefficient of the steel pipes were derived on the basis of the statistical analysis of the field data. The findings from this paper can provide guidance for the design of the jacking load during microtunneling operations for the installation of steel utility pipelines and pipe roofs.
publisherAmerican Society of Civil Engineers
titleExperimental and Analytical Study of Jacking Load during Microtunneling Gongbei Tunnel Pipe Roof
typeJournal Paper
journal volume144
journal issue1
journal titleJournal of Geotechnical and Geoenvironmental Engineering
identifier doi10.1061/(ASCE)GT.1943-5606.0001801
page05017006
treeJournal of Geotechnical and Geoenvironmental Engineering:;2018:;Volume ( 144 ):;issue: 001
contenttypeFulltext