Show simple item record

contributor authorFernando Cabero Colín
contributor authorAntonio Sánchez Soliño
contributor authorAntonio L. Lara Galera
date accessioned2017-12-16T09:06:00Z
date available2017-12-16T09:06:00Z
date issued2017
identifier other%28ASCE%29IS.1943-555X.0000309.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4238513
description abstractAs long as motorway concessions are subject to the variability of traffic demand, it is necessary to apply valuation methods that can take into account that uncertainty. In the past, many concession projects have faced an early termination of the contract due to lower traffic than expected. These insolvency situations raise the issue of the compensation to the concessionaire when the contract is prematurely terminated. A methodology based on the real-options approach has been developed in this paper to assess insolvency situations in motorway concessions. Under this approach, the mechanism of compensation can be modeled as an abandonment option, granted by the public administration to the concessionaire, in which the value of the option will depend on the evolution of traffic. This methodology is then applied to the case of a real concession in Spain. The results show a significant value of the abandonment option, which represents an implicit aid from the public administration to the concession. In this way, the methodology presented in this paper can contribute to gaining a better understanding of the risks of motorway concessions and enhancing the transparency in concession contracts.
publisherAmerican Society of Civil Engineers
titleDefault and Abandonment Option in Motorway Concessions
typeJournal Paper
journal volume23
journal issue1
journal titleJournal of Infrastructure Systems
identifier doi10.1061/(ASCE)IS.1943-555X.0000309
treeJournal of Infrastructure Systems:;2017:;Volume ( 023 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record