Show simple item record

contributor authorBoscariol, Paolo
contributor authorGasparetto, Alessandro
contributor authorScalera, Lorenzo
contributor authorVidoni, Renato
date accessioned2017-11-25T07:18:17Z
date available2017-11-25T07:18:17Z
date copyright2017/20/3
date issued2017
identifier issn1942-4302
identifier otherjmr_009_03_031001.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4235087
description abstractIn this work, the kinematics of a large size tunnel digging machine is investigated. The closed-loop mechanism is made by 13 links and 13 class 1 couplings, seven of which are actuated. This kind of machines are commonly used to perform ground drilling for the placement of reinforcement elements during the construction of tunnels. The direct kinematic solution is obtained using three methods: the first two are based on the numerical solution of the closure equation written using the Denavit–Hartenberg convention, while the third is based on the definition and solution in closed form of an equivalent spherical mechanism. The procedures have been tested and implemented with reference to a real commercial tunnel digging machine. The use of the proposed method for the closed-form solution of direct kinematics allows to obtain a major reduction of the computation time in comparison with the standard numerical solution of the closure equation.
publisherThe American Society of Mechanical Engineers (ASME)
titleEfficient Closed-Form Solution of the Kinematics of a Tunnel Digging Machine
typeJournal Paper
journal volume9
journal issue3
journal titleJournal of Mechanisms and Robotics
identifier doi10.1115/1.4035797
journal fristpage31001
journal lastpage031001-13
treeJournal of Mechanisms and Robotics:;2017:;volume( 009 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record