description abstractCost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. This paper identifies the reasons bottom up from four case project documents and further quantifies their contributions to cost and schedule increases. These reasons are complete and can be used to analyze the cause-effect relationship, trace responsibility, and improve performance for engineering design projects.
publisherAmerican Society of Civil Engineers
titleReasons for Cost and Schedule Increase for Engineering Design Projects
typeJournal Paper
journal volume18
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)0742-597X(2002)18:1(29)
treeJournal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record