Show simple item record

contributor authorWojcik, Gary S.
contributor authorFitzjarrald, David R.
date accessioned2017-06-09T14:08:07Z
date available2017-06-09T14:08:07Z
date copyright2001/11/01
date issued2001
identifier issn0894-8763
identifier otherams-13073.pdf
identifier urihttp://onlinelibrary.yabesh.ir/handle/yetl/4148483
description abstractAtmospheric conditions for several days after concrete is poured influence the exothermic, temperature-dependent, hydration reactions of concrete's cementitious (binding) components. Because excessively high concrete temperatures or lack of water eventually can lead to cracking, the initial days are critical to determining the concrete's long-term durability. Accurate model forecasts of concrete temperatures and moisture would help engineers to determine an optimal time to pour. Such forecasts require adequate environmental predictions. Existing models of curing concrete bridge decks employed by engineers lack realistic boundary conditions and so cannot handle many atmospheric conditions. Atmospheric energy exchange parameterizations typically are intended for use over areas much larger than bridges and so may not be useful as boundary conditions in curing-concrete models. To determine proper boundary conditions for the curing-concrete model discussed here, energy balances of four curing concrete bridge decks were estimated from observations made in the atmosphere as well as inside the concrete. Common meteorological techniques to estimate energy balance terms were used to bound the estimates. Most (70%?85%) of the concrete heat transfer occurred at the bridge's top. Sensible, latent, net radiative, and runoff water (sprayed on the top surface) heat fluxes, respectively, contributed 6%?24%, 15%?58%, 10%?34%, and 0%?73% of the top surface heat transfer. Bottom heat transfer was less than 30% of the top surface transfer. Laboratory calorimetry and the energy balance results agree to within 20% that the hydration reactions evolved about 190 kJ kg?1 by 24 h after mixing. This agreement validates the exchange coefficients proposed for the heat and moisture balances of these small areas both during periods when the concrete generated heat and later when the concrete was more passive in its environment.
publisherAmerican Meteorological Society
titleEnergy Balances of Curing Concrete Bridge Decks
typeJournal Paper
journal volume40
journal issue11
journal titleJournal of Applied Meteorology
identifier doi10.1175/1520-0450(2001)040<2003:EBOCCB>2.0.CO;2
journal fristpage2003
journal lastpage2025
treeJournal of Applied Meteorology:;2001:;volume( 040 ):;issue: 011
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record