Show simple item record

contributor authorCohen, Stewart J.
date accessioned2017-06-09T13:58:29Z
date available2017-06-09T13:58:29Z
date copyright1981/12/01
date issued1981
identifier issn0021-8952
identifier otherams-10166.pdf
identifier urihttp://onlinelibrary.yabesh.ir/handle/yetl/4145253
description abstractMany activities associated with the transportation sector are weather sensitive. This study is concerned with highway maintenance activities, specifically snow removal, and the budgeting of same by the Illinois Department of Transportation (IDOT). During the 1978?79 winter, IDOT's snow removal budget was exhausted by the end of January, thereby necessitating the procurement of emergency funds. The following year, the Illinois State Water Survey (ISWS) was asked to provide specialized climatic design information that could be used to assist IDOT in its budget planning for snow removal. Snow removal is often accomplished by spreading road salt over snow- and ice-covered roads, thus improving traction and reducing the risk of vehicles skidding along slippery surfaces. This study demonstrates the computation of ?salt days,? a user-oriented climatic variable that indicates the number of days when road salt is required. This variable is defined using certain temperature and snowfall criteria. Results of a pilot study indicate that it is possible to provide statistical outlooks for salt days two months in advance, using correlation analysis. The analysis for several Illinois stations indicates that at various intervals in the data records, November and December temperatures are significantly correlated with February salt days if short periods of record (5?20 years) are used. IDOT originally requested a ?2- to 3-month projection.? However, it became clear that only projections of 12 months or longer could benefit annual budget preparation. Confusion existed between the user and the supplier of climatic information regarding the user's needs, and the applicability of the supplier's ?climate products? to the user's budget planning procedure. This demonstrates the need for a prolonged effort by the supplier to fully acquaint the user with the various forms of climatic information available. This gap in communication must be overcome so that applied climatology can be integrated into the user's decision making procedure on a ?real-time? basis.
publisherAmerican Meteorological Society
titleUser Oriented Climatic Information for Planning a Snow Removal Budget
typeJournal Paper
journal volume20
journal issue12
journal titleJournal of Applied Meteorology
identifier doi10.1175/1520-0450(1981)020<1420:UOCIFP>2.0.CO;2
journal fristpage1420
journal lastpage1427
treeJournal of Applied Meteorology:;1981:;volume( 020 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record