Show simple item record

contributor authorJyh-Cherng Jong
contributor authorPaul Schonfeld
date accessioned2017-05-08T21:10:19Z
date available2017-05-08T21:10:19Z
date copyrightFebruary 2001
date issued2001
identifier other%28asce%290733-950x%282001%29127%3A1%2845%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41372
description abstractInvestment planning for systems with interdependent queues, such as a series of interacting waterway locks, is a very challenging problem. Under budget constraints, it must be determined which projects should be selected and when they should be funded to minimize the present value of total cost over the planning horizon. Due to interdependence among service stations (e.g., locks), investment planning for such systems cannot be analyzed separately for each station. Published models on investment planning for interdependent projects are rare and difficult to apply to a series of queuing systems. A genetic algorithm approach is presented in this paper for solving project sequencing and scheduling problems for such systems. A numerical example is designed to investigate the proposed algorithm. Results indicate that the proposed approach is quite efficient in finding very good solutions.
publisherAmerican Society of Civil Engineers
titleGenetic Algorithm for Selecting and Scheduling Interdependent Projects
typeJournal Paper
journal volume127
journal issue1
journal titleJournal of Waterway, Port, Coastal, and Ocean Engineering
identifier doi10.1061/(ASCE)0733-950X(2001)127:1(45)
treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;2001:;Volume ( 127 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record