Show simple item record

contributor authorOscar Cordeiro Netto
contributor authorÉric Parent
contributor authorLucien Duckstein
date accessioned2017-05-08T21:07:17Z
date available2017-05-08T21:07:17Z
date copyrightNovember 1996
date issued1996
identifier other%28asce%290733-9496%281996%29122%3A6%28403%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39451
description abstractA multicriterion decision-making (MCDM) methodology is developed to design a long-term water supply system involving multiple actors. A 1989 regional development plan for augmenting water resources in the Adour-Garonne Basin (southwestern France) is used to illustrate the approaches. The specific problem of the choice of a site for building a large reservoir is investigated. The problem elements consist of four actors, 13 criteria, and 38 alternatives. The first phase of the methodology, the ELECTRE III technique, is used to screen alternatives and reduce the choice set to eight “efficient” alternatives, which are then examined in some detail. In the second phase, the multiactor multicriterion decision process is modeled by means of an extension of ELECTRE III. The solutions thus obtained are compared to the outcomes of the actual decision process. The similarities and differences between the model and reality are used to assess the suitability of that approach.
publisherAmerican Society of Civil Engineers
titleMulticriterion Design of Long-Term Water Supply in Southern France
typeJournal Paper
journal volume122
journal issue6
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1996)122:6(403)
treeJournal of Water Resources Planning and Management:;1996:;Volume ( 122 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record