| contributor author | Thomas M. Walski | |
| date accessioned | 2017-05-08T21:07:08Z | |
| date available | 2017-05-08T21:07:08Z | |
| date copyright | July 1995 | |
| date issued | 1995 | |
| identifier other | %28asce%290733-9496%281995%29121%3A4%28340%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/39365 | |
| description abstract | An important reason for the lack of wide acceptance of pipe-sizing optimization in engineering practice is the fact that there is not one single pipe-sizing problem, but rather several significantly different types of pipe-sizing problems. These include long-term master planning, preliminary design, subdivision layout, and rehabilitation, which are also related to problems of tank sizing and location, tank-overflow level, pressure-zone boundary, pump selection, pump operation, and control-valve setting. Each type of problem brings specific areas of concern and specific assumptions that should be used in preparing pipe-sizing models. By making model developers aware of the context in which these sizing decisions are made, this paper should contribute to development of more relevant and widely used models. | |
| publisher | American Society of Civil Engineers | |
| title | Optimization and Pipe-Sizing Decisions | |
| type | Journal Paper | |
| journal volume | 121 | |
| journal issue | 4 | |
| journal title | Journal of Water Resources Planning and Management | |
| identifier doi | 10.1061/(ASCE)0733-9496(1995)121:4(340) | |
| tree | Journal of Water Resources Planning and Management:;1995:;Volume ( 121 ):;issue: 004 | |
| contenttype | Fulltext | |