Show simple item record

contributor authorJ. J. Warwick
contributor authorS. J. Haness
date accessioned2017-05-08T21:07:01Z
date available2017-05-08T21:07:01Z
date copyrightMay 1994
date issued1994
identifier other%28asce%290733-9496%281994%29120%3A3%28366%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39269
description abstractA hypothetical watershed was constructed to test the efficacy of using the ARC/INFO geographic information system to provide spatially related input for the U.S. Army Corps of Engineers HEC‐1 hydrologic model. The ARC/INFO system performed the tedious and time‐consuming tasks of spatial averaging (basin areas, average runoff curve numbers. etc.) quite well. Difficulties, however, were encountered in using the TIN (triangulated irregular network) module to accurately assess average rainfall intensities. The inaccuracies associated with the computation of average basin rainfall intensities were quantified by using a defined rainfall pattern imposed upon a simple geometric shape (equilateral triangle) and were found to be directly related to the number of prescribed contouring intervals. The highest density of contouring intervals (0.010 nm) resulted in only a 0.55% over‐estimation. The number and location of rain gages relative to watershed boundaries imparted a significant error (approximately ± 10%) to average rainfall estimation.
publisherAmerican Society of Civil Engineers
titleEfficacy of ARC/INFO GIS Application to Hydrologic Modeling
typeJournal Paper
journal volume120
journal issue3
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1994)120:3(366)
treeJournal of Water Resources Planning and Management:;1994:;Volume ( 120 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record