Show simple item record

contributor authorHsieh Wen Shen
contributor authorGuillermo Tabios, III
contributor authorJames A. Harder
date accessioned2017-05-08T21:07:01Z
date available2017-05-08T21:07:01Z
date copyrightMay 1994
date issued1994
identifier other%28asce%290733-9496%281994%29120%3A3%28330%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39267
description abstractThe channelization project in the Lower Kissimmee River Basin, Florida resulted in severe losses of river floodplain wetlands and waterfowl throughout the river valley. An earth channel, the C‐38 canal, is the main element of this project. Immediately after the project completion in 1971, a strong effort was initiated to restore this basin to its prechannelization status. This project, if and when completed, would set a milestone toward our commitment to the enhancement of ecological harmony because its only major goal is ecological enhancement. The investigation of various alternative restoration plans is described. First, the ecological goals for the restoration plans were formulated. Then, the alternative restoration plans were tested against the ecological goals through a combination of field data collection, physical modeling, and numerical modeling. Finally, the backfilling of certain reaches of C‐38 canal was recommended.
publisherAmerican Society of Civil Engineers
titleKissimmee River Restoration Study
typeJournal Paper
journal volume120
journal issue3
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1994)120:3(330)
treeJournal of Water Resources Planning and Management:;1994:;Volume ( 120 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record