Show simple item record

contributor authorJ. Alberto Tejada‐Guibert
contributor authorJery R. Stedinger
contributor authorKonstantin Staschus
date accessioned2017-05-08T21:06:36Z
date available2017-05-08T21:06:36Z
date copyrightJanuary 1990
date issued1990
identifier other%28asce%290733-9496%281990%29116%3A1%2852%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39012
description abstractCVPOP is a nonlinear programming model for the optimization of the multi‐month operation of the hydropower system of the California Central Valley Project (CVP). CVPOP includes the dependence of energy values within each month on the capacity factor of the generating unit, avoiding the simplification of assuming constant monthly or yearly values as is common in other models. The model also includes contractual energy and capacity constraints which are nonlinear because of the powerplants' variable head performance curves (capability in MW and energy production rate in kWh per unit release versus reservoir storage). An example illustrates the difference between the values of the energy generated with operations schedules obtained using different objective functions.
publisherAmerican Society of Civil Engineers
titleOptimization of Value of CVP's Hydropower Production
typeJournal Paper
journal volume116
journal issue1
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1990)116:1(52)
treeJournal of Water Resources Planning and Management:;1990:;Volume ( 116 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record