Show simple item record

contributor authorRandy Graham
date accessioned2017-05-08T21:06:22Z
date available2017-05-08T21:06:22Z
date copyrightJanuary 1988
date issued1988
identifier other%28asce%290733-9496%281988%29114%3A1%2852%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38883
description abstractA case study of the Horse Creek basin in eastern Wyoming is presented. The study involved calculating the 100‐year frequency and the probable maximum flood at several potential dam locations using a deterministic hydrologic model. The basin drains 1,560 sq mi. The basin has a long‐record gage near the point of interest, but the record is suspect due to irrigation diversion and return flows. Therefore, a flood flow frequency analysis from a hydrologically similar basin was performed. This included peak discharge and high volume‐duration‐frequency derivations. The model allows centering of a storm over a critical portion of the basin, with residual rainfall over the remainder. The study concludes that generation of rare‐event and probable‐maximum‐flood (PMF) design discharges at gaged locations requires careful analysis of the basin and gaged data. This includes review of hydrologically similar basins to allow generation of appropriate statistical parameters for calibration of a deterministic model.
publisherAmerican Society of Civil Engineers
titleHydrologic Study of Large Basin in Eastern Wyoming
typeJournal Paper
journal volume114
journal issue1
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1988)114:1(52)
treeJournal of Water Resources Planning and Management:;1988:;Volume ( 114 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record