Show simple item record

contributor authorMichael F. Gorman
contributor authorJohn J. Kanet
date accessioned2017-05-08T21:05:18Z
date available2017-05-08T21:05:18Z
date copyrightAugust 2010
date issued2010
identifier other%28asce%290733-947x%282010%29136%3A8%28701%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38179
description abstractThe rail industry spends billions of dollars each year on maintenance and renewal of its track infrastructure. The scheduling of these maintenance projects is extremely complex, with numerous hard and soft cost trade-offs and job scheduling constraints. Scheduling requires consideration of efficient maintenance production “gang” routing around the rail network while paying close attention to any train delay such maintenance projects might cause. Despite this importance and complexity, the subject has been largely ignored in the literature. We evaluate two formulations (time-space network mixed integer program and job scheduling) and three modeling formulation and solution methodologies (integer programming, constraint programming, and genetic algorithms) for scheduling rail gangs to annual renewal projects and discuss their relative merits in terms of parsimony of model formulation, solution time, and solution quality. The purpose of this paper is to identify the most fruitful avenues for further research on this novel application.
publisherAmerican Society of Civil Engineers
titleFormulation and Solution Approaches to the Rail Maintenance Production Gang Scheduling Problem
typeJournal Paper
journal volume136
journal issue8
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(2010)136:8(701)
treeJournal of Transportation Engineering, Part A: Systems:;2010:;Volume ( 136 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record