Show simple item record

contributor authorAlfred E. Fazio
date accessioned2017-05-08T21:04:26Z
date available2017-05-08T21:04:26Z
date copyrightMay 2004
date issued2004
identifier other%28asce%290733-947x%282004%29130%3A3%28365%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/37614
description abstractLight rail transit (LRT) offers the widest range of opportunities to the design community in “applications engineering.” There are certainly more varied possibilities in the design and configuration of LRT than in that of rail rapid transit or commuter rail. Consequently, it is particularly important to understand the relationship between applications design and railway operations when deploying light rail. The development of a new rail system should begin with a clearly stated operational requirements document and then evolve to a comprehensive, systems-level design. This evolution must be supported by an active systems integration process. Examples of this approach are taken from the deployment of the Hudson-Bergen Light Rail, a high-performance light rail transit system located in northern New Jersey that is currently in deployment through a design, build, operate, and maintain contract.
publisherAmerican Society of Civil Engineers
titleRelationship between Light Rail Systems Design and System Operations
typeJournal Paper
journal volume130
journal issue3
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(2004)130:3(365)
treeJournal of Transportation Engineering, Part A: Systems:;2004:;Volume ( 130 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record