| contributor author | Ram B. Kulkarni | |
| contributor author | Deb Miller | |
| contributor author | Rosemary M. Ingram | |
| contributor author | Chi-Wah Wong | |
| contributor author | Julie Lorenz | |
| date accessioned | 2017-05-08T21:04:23Z | |
| date available | 2017-05-08T21:04:23Z | |
| date copyright | March 2004 | |
| date issued | 2004 | |
| identifier other | %28asce%290733-947x%282004%29130%3A2%28150%29.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/37589 | |
| description abstract | This paper presents a need-based methodology to prioritize and select highway projects for improvement. This approach is based on developing a multiattribute need function that quantifies relative concerns of a highway agency and the traveling public about various physical and operational deficiencies on different highway segments. It is an effective alternative to the traditional cost-benefit analysis. While the cost-benefit analysis may be useful in evaluating a small number of project alternatives at a fixed location (e.g., alternative alignments for a single corridor), it has major limitations when applied to a large-scale (e.g., statewide) highway construction program. This paper discusses some of the philosophical and practical limitations of the cost-benefit analysis and how the need-based approach overcomes these limitations. A successful implementation of the need-based approach to Kansas’s statewide highway improvement program is also described. | |
| publisher | American Society of Civil Engineers | |
| title | Need-Based Project Prioritization: Alternative to Cost-Benefit Analysis | |
| type | Journal Paper | |
| journal volume | 130 | |
| journal issue | 2 | |
| journal title | Journal of Transportation Engineering, Part A: Systems | |
| identifier doi | 10.1061/(ASCE)0733-947X(2004)130:2(150) | |
| tree | Journal of Transportation Engineering, Part A: Systems:;2004:;Volume ( 130 ):;issue: 002 | |
| contenttype | Fulltext | |